MANILA, Philippines — The government is eyeing the filing of charges against the Discayas over poor structural design and unfinished work of the Philippine Film Heritage Building (PFHB) in Intramuros, Manila, Malacañang said Thursday., This news data comes from:http://mxhi-lefe-ep-ue.705-888.com
Palace Press Officer Claire Castro discovered the sloppy construction of the film center during her inspection of the PFHB that was supposed to be completed Sept. 4, 2025.
Castro said the PFHB was built by the Discaya-owned Great Pacific Builders and General Contractor Inc.

Govt eyes charges vs Discayas over 'unfinished' PH Film Heritage Building
"This building should be turned over now because that it's supposedly finished, Sept. 4, 2025. We can see now how it's built and why it's disappointing," Castro told reporters after inspecting the film center.
"And this building, its contractor is Great Pacific Builders and General Contractor Inc. This is one of the corporations of the Discayas," she added.
- Two dead as strong earthquake jolts Afghanistan
- Lacson lauds Leviste for arrest of DPWH engineer who offered P360M bribe
- Pagasa sees two to four tropical cyclones hitting Philippines in September
- Lacson to give Dizon 'damning' proof vs DPWH 'rotten fruits'
- Bersamin letter proves Torre reassignments ‘valid’
- Thailand's former Prime Minister Thaksin makes surprise departure ahead of a risky court ruling
- DSWD program reduced hunger
- Marcos orders lifestyle check on all govt officials amid flood projects probe
- Drones take on Everest's garbage
- LPA over West PH Sea develops into tropical depression, now called ‘Jacinto’ -- Pagasa